Cerros Sands Belize Waterfront Community

Building here

Architectural guidelines

All building concepts must be submitted to the Architectural Committee for review. Do this before an architect begins work on your plans — it is far cheaper to adjust a concept than a finished set of construction documents.

Zoning and minimum building requirements

R-1 Single Family Residential — one home per parcel

All residential parcels currently in inventory are classified R-1, and R-1 lots cannot be subdivided. Minimum floor area, excluding the garage:

Parcel typeMinimum size
Beachfront1,800 sq ft
Beach-view1,400 sq ft
Channel1,400 sq ft

Construction setbacks for R-1

Side yards10 feet
Main road frontage25 feet
Beachfront25 feet from the Beachfront Reserve
Beachfront / beach-view line25 feet from the property line separating it from the beach-view parcel
Channel25 feet from the Channel Reserve
Beach-view25 feet from the lot line separating it from beachfront property

Exempt from setbacks: pools, patios, decks, balconies and stairwells.

Cul-de-sacs serve as access points for the beachfront and beach-view parcels.

Working with a Belizean architect

Every home at Cerros Sands is custom-designed. Belizean architects must approve the plans — this is a Belizean Government requirement, not a community preference. They will work with you to develop your design within these guidelines.

Fences, walls and structures

No fence or wall may be built on any part of a lot without Architectural Committee approval. Structures must sit on your own property, or on the property line by agreement with the adjoining owner to form a common barrier.

LocationMaximum height
Side yards4 ft
Front yards4 ft
Back yards4 ft
Seafront3 ft
Pools4 ft

Privacy walls are subject to Architectural Committee discretion. Pool fences should be at least 48 inches high from the finished level, measured along the exterior, with no more than a two-inch gap beneath.

Materials

Acceptable materials: wood, stone, masonry, steel, iron, aluminium, plastic or Coventec. Masonry and Coventec must be plastered. Zinc siding is not permitted.

Power, docks and other systems

Off-grid applications including wind and solar are permitted, and new technologies will be reviewed for approval. Docks are allowed on the canal and waterfront with the necessary permits and Architectural Committee approval.

Commercial and future designations

The following may be used in future as part of the Marina Specific Plan, for duplexes, townhomes and condominiums: R-2 (two units), R-3 (three units) and R-4 (multi-unit residential).

C-BBCommercial Bed and Breakfast — parcels 808 & 809 (can function as two R-1 parcels)
C-MCommercial Marina
C-OCommercial Office
C-RCommercial Retail
C-RESCommercial Resort — parcels 852–855 & 768, future parcels 28–32
C-SCommercial Services

Commercial parcel designations may be altered to enhance the desirability of the community. Proposals for R-E, R-2, R-3, R-4 and C designations may be submitted for review by the Architectural Committee and the Developer.

Before you commission drawings

Send us your concept first. We will tell you plainly whether it fits the guidelines, which saves you paying an architect to redraw. See also the construction FAQ and the covenants and restrictions.

Submit a concept
Cerros Sands — waterfront land in Corozal, Belize